How Washoe County plows Incline Village
Washoe County plows the public roads in Incline Village and Crystal Bay. NDOT plows the state highways. In storms, red-day parking rules keep cars off the street so the plows can get through.
Who plows your road
Washoe County Roads, from its Incline Village yard, in priority order. NDOT plows SR-28 and the Mt. Rose Highway (SR-431).
Red and green days
Winter parking restrictions start Oct 1. On red days street parking is illegal; on green days it is allowed. Parking stays restricted until ice is cleared. Check the county map or call 775-833-5555.
Your driveway and the berm
No public agency clears private driveways. The snow the plow pushes across the end of your driveway is yours to clear, and most season contracts include it.
Steep driveways
Many Incline driveways are steep. The snow walls need pushing back as the season goes on, or the driveway narrows with each storm.
Rules can change. Check Washoe County's winter parking page before relying on them.

Incline Village and Crystal Bay
Send a request from any of them. We match by street.
What snow removal costs in Incline Village
Typical prices for the 2026–27 season from published Lake Tahoe price lists and local contractor rates. The crew confirms the exact price for your property before any work starts.
- Steep and long drivewaysMore time per visit, and they usually need sanding.
- Large homesBig roofs and decks take a bigger crew.
- Higher up toward Mt. RoseMore snow per storm than at lake level.
| Driveway, one visitStandard driveway, berm opened. | from ~$130 |
| Driveway, full seasonEvery qualifying storm, about Nov to mid-April. | $850–$1,500 |
| Roof snow removalMost cabins need a crew of 2–4. | $100–$120/hr per person |
| Decks, stairs and walkwaysShoveled by hand. | $60–$120/hr |
| Ice dam removalLow-pressure steam along the eaves. | $600–$1,500 |
Incline Village snow forecast: next 72 hours
Expected new snow in Incline Village, updated by the National Weather Service in Reno. If a big storm is coming, send your request before routes fill up.
Snowfall in inches. Source: National Weather Service, Reno.
Incline Village snow removal questions
What are red and green days in Incline Village?
During winter, Washoe County marks each day red or green. On red days it's illegal to park on the street so plows can work; on green days parking is allowed. Check the county map or the hotline at 775-833-5555.
Who plows Incline Village roads?
Washoe County plows the public roads in Incline Village and Crystal Bay. NDOT plows SR-28 and the Mt. Rose Highway. Driveways and the berm at the end of them are the owner's to clear.
Can a crew clear my place when I'm not in town?
Yes. A season contract with a set trigger depth means the crew comes every storm without being called. Ask for a photo after each visit.
Why clear the driveway before driving on it?
Tires pack fresh snow into ice that is much harder to remove and can last for weeks. Packed ruts also make the next storm harder to clear, and the berm left by the street plow freezes solid overnight. A driveway cleared soon after the snow stops stays clear.
What is an ice dam?
An ice dam is a ridge of ice along the edge of the roof. Heat escaping from the house warms the roof and melts the bottom of the snow. The water runs down to the eaves, which sit over cold air, and freezes there. Over several melt and freeze cycles the ridge grows, water pools behind it, and it can back up under the shingles and leak into ceilings and walls. Long icicles along the gutters are a common sign.
How do I prevent ice dams?
The lasting fix is keeping heat out of the attic: seal the air leaks between the house and the attic, add insulation, and keep the roof vents working. In the meantime, keep the lower edge of the roof clear after storms so there's less snow to melt and refreeze. If a dam has already formed, have it removed with low-pressure steam. Chipping at it with tools damages shingles and gutters.
When should snow come off the roof?
After big storms, when the snow on the roof is deep and dense, before rain is forecast on top of it (rain soaks in and adds a lot of weight), when ice dams or large icicles start to form, and any time snow covers vents, chimneys or exits.